CIVIL

Sammut Marine Group is a leading marine and land-based civil engineering firm, renowned in Malta and internationally.

Sammut Marine Group is honoured to be working on several projects both in Malta and abroad which range from warehousing, a showroom on four levels including car park and storage, to blocks of residential accommodations including garages, apartments, maisonettes, penthouses, terraced houses and villas for the development of air-spaces which include penthouses and apartments.

 

As a firm, we are also involved in several marine projects and sea-based structures whilst working on small scale tasks such as regularazation of applications, renovation of apartments and penthouses, together with projects located in ODZ development such as the construction of reservoirs, agricultural storage and pump rooms. 

 

As a structural and civil engineering firm having a section dedicated to interior design, we follow projects from conception to completion, starting with conceptual design, full architectural design, submission at the Planning Authority (PA), and correspondance with all local entities such as ERA, SCH, MTA, etc. Civil engineering design including foundations and structural design, project supervision on site, project management and interior design. 

 

 

Replacement of Promenade - Balluta Bay

Sammut Marine started the precast process at the contractor's yard. Works started by surveying area and constructing 28 different precast panels. 

In the meantime, another team was responsible for the demolition of the existing precast panels. For this section of this project, Sammut Marine followed by carefully works at Balluta Bay breaking half of the ring beam on the seaward side using hand held tools while avoiding damage to the existing arches. Once the above works were completed, precast panels were brought to site and hoisted to their location. Further onsite reinforcement was installed and area was casted in-si. 

Balluta 2 .JPG

Construction of Lido and Restaurant & Land Reclamation - Sliema

This part of project consisted of a concrete / masonry restaurant / sports area on two levels each, the levels covering a total area of approximately 600 square meters. It mainly consisted of concrete columns, beams and plates. Due to the location of the existing rock foundations, the columns were constructed on 700-900mm diameter pipes. The site was very long and narrow, and this, in itself presented its own logistical problems. Despite these difficulties, this part of the project was finished three months ahead of schedule.

Website-civil.jpeg

Construction of Swimming Pool - Mosta

Works at Mosta consisted of demolition and excavation works (both above and under water), and the construction of a swimming pool for a resendtial property.

Steve Pool Mosta.jpeg

Quay Re-construction - Garden's Yacht Marina

This project consisted in the re-construction of approximately a 600m long curved quay capable to withstand the forces from a new berthing system including the supply, installation of a number of pontoons and service culverts. The works were carried out in a very tight schedule and included the co-ordination of the piling equipment.

WhatsApp Image 2021-07-03 at 09.15.12 (2).jpeg

Demolition of Factory at Hal Kirkop

Works at Kirkop involved the excavation and demolition of KK3 at ST site, , construction of the inset and precast walls, complete with the installation of pontoons gangways, ramps, construction of service culverts for the new supply of electricity, water and sea reclamation to enlarge the existing working area for the fisherman.

WhatsApp Image 2023-02-27 at 15.50.29.jpeg

Concrete Repairs - Balluta Bay

Works were commenced by breaking up loose concrete using small jiggers. The demolished material was loaded and carted away to an approved site. Reinforcement was then thoroughly cleaned from rust via means of an angle grinder and wire brush. The following step was to paint the reinforcement with a paintbrush and 2 coats of Sika Monotop were applied. Next, concrete voids were filled to the required level with Betoflex bT60. Once these processes were completed, the surface was coated using Primer 1 and a spray coat of Sika Lastic was applied.

DJI_0008.JPG

Construction - Marsa

This project in Marsa consists of the construction and Design and of a block of 5 Apartments.

Morsa Construction .jpeg